Nearly There
The work by Staffordshire County Council is almost completed in Checkley Lane. Well,we hope it is. The telecom mast site area drain has been repaired by SCC (broken when the mast was installed). This will be recharged to the EE contractor who carried out the work, of course. It seems that this broken pipe had caused silt and water to build up across the road and burst the ceramic drain in the layby opposite. this too has now been repaired and a swanky inspection chamber installed which will hopefully mean the road will not need to be dug up again. Potholes will be filled. Sealing, the edges of potholes and road repairs, is no longer favoured by the SCC I am told, since the black sealant becomes slippery and cyclists were falling off their bicycles. So the large ravine on the side of the road which had been created by the flood damage is to be filled in with compacted sand. It will be interesting to see how long this lasts. It s...